The Pre-Drywall Construction Inspection is completed just prior to the installation of the drywall. All
rough electrical, plumbing, heating, ventilation, and air conditioning (HVAC) should be completed at this
point. All subcontractors' work will have been checked and follow-up visits completed. This is one of
the most critical inspections as all construction to this point will be covered and will no longer be visible. It
will typically take from a few weeks to two months or more between the framing and pre-drywall
inspection.
The Pre-Drywall Construction Inspection is scheduled at a precise time during the construction process. It is
critical the client and builder coordinate this inspection to ensure all systems and components will be visible on
the day of the inspection and that subcontracts have completed all work.
This is a
critical inspection as most construction defects will be covered up at this time and can
be extremely difficult to detect and or repair. Once hidden by drywall, construction defects may go undetected
for years!
Items Inspected:
 |
All Systems and Components
Not Reported on in Prior Inspections (if visible) |
 |
Rough Plumbing - Water Distribution
and Sewer |
 |
Rough Electrical - Main Electrical
Panel and Branch Circuits |
 |
HVAC Installation and Ductwork |
 |
Fire Stop and Fire Blocking |
 |
Chimney and Fireplace Installations
(if applicable) |
 |
Attic Ventilation and
Insulation |
 |
Exterior Wall Cladding |
Top of Page
So what are you waiting for
...
We
are here to serve you--to answer ALL of your questions and to give you the peace of
mind of knowing as much as possible about the property, what it has to offer and what needs to be repaired. Call
today!
Call (480) 456-8809 or go online to schedule your
inspection!

|